
Add to Cart
Economic Salt Fog Spray Wetting Test Chamber for Acetic Acid Coating Corrosion
PT-2070 salt spray test machine.pdf
Meet Standards: GB/T10125/10587,ASTM B117/B287,JIS Z2371,CNS3627
Purpose:
Salt Fog Spray Wetting Test Chamber for Acetic Acid Coating Corrosion is against all kind material after anti-corrosion treatment then to test its corrosion resistance.It is ideal for testing the resistance to salt spray corrosion of some products by measuring and comparing similar materials, their usability quality. It is applicable to test salt spray corrosion resistance of such products as parts, electronic components,protective layer of metallic material and industrial products
Salt Spray Test Chamber Features:
Specifications:
Item Name | Economic Salt Fog Spray Wetting Test Chamber for Acetic Acid Coating Corrosion | ||
Model | PT-2070A | PT-2070B | |
Test Space | 60x45x40 cm (WxDxH) | 90x60x50 cm (WxDxH) | |
Dimensions | 114x76x119 cm (WxDxH) | 142x78x128 cm (WxDxH) | |
Temperature Range | Room Temperature ~ 80℃ | ||
Control Method | P.I.D automatic Temperature Calculation control | ||
Temperature Resolution | 0.1℃ | ||
Temperature Control Accuracy | ±0.3℃ | ||
Temperature Distribution Accuracy | ±1℃ | ||
Timer | 0~999.9 hours (minutes) digital display | ||
Accessories | Test Salt, Graduated Cylinder, Tools | ||
Safety Protection | Independent EGO over-temperature power failure, safety overload switch | ||
Spray Volume | 1~10c.c./Hour | ||
Volume of Test Space | 108 liters | 270 liters | |
Salt Sump | Volume | 15 liters | 30 liters |
Test Time | 90 hours | 180 hours | |
Specimen 150x70mm | Tilted 15° | 24 pieces | 48 pieces |
Tilted 30° | 15 pieces | 30 pieces | |
Material | F.R.P. | ||
Weight | 60 kg | 150 kg | |
Power | 1PH,AC220V,50/60Hz,6KW | 1PH,AC220V,50/60Hz,3KW |
Salt Fog Spray Test Chamber Pictures:
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order